Search found 65 matches
- Tue Aug 07, 2012 11:00 pm
- Forum: Electric Meters
- Topic: The T's
- Replies: 9
- Views: 18474
Re: The T's
On the v.3 parsing sheet T1 (bits 25 to 32) is listed as T1 KWH, Total KWH for Line 1 ? T2 (bits 33 to 40) Line 2 KWH ? Add them together and I get the same as Total KWH (bits 17 to 24) I am only using Line 1 & Line 2 I am not at present using Line 3 but assume that T3 is L3 KWH But what is T4 =...
- Tue Aug 07, 2012 1:58 pm
- Forum: Electric Meters
- Topic: The T's
- Replies: 9
- Views: 18474
The T's
In the Dash soft ware what do T1 ,T2 T3 & T4 monitor ?
I assume T1 is Line1 Pwr; T2 Line 2 Pwr; and T3 Line 3 pwr in a 3 phase system. I am mystified however by what T4 does.
I assume T1 is Line1 Pwr; T2 Line 2 Pwr; and T3 Line 3 pwr in a 3 phase system. I am mystified however by what T4 does.
- Sat Aug 04, 2012 2:17 am
- Forum: Electric Meters
- Topic: Question re:Max Demand and Power factor
- Replies: 4
- Views: 12083
Re: Question re:Max Demand and Power factor
We would be curious to know why you will need or like to reset Max Demand every 5 minutes. Is this how you are billed? My application is to monitor my generator output, so that I don't over load it. Max Demand indicates how close I might come to doing so. Well made gennies (4 pole 1800 RPM) are big...
- Thu Aug 02, 2012 10:49 pm
- Forum: Electric Meters
- Topic: Question re:Max Demand and Power factor
- Replies: 4
- Views: 12083
Re: Question re:Max Demand and Power factor
Thanks for the info on "Max Demand"
Makes sense now. Not as useful as I would like it to be though. 5 minutes would be about right for my purpose.
In your new Dash software there seems to be a count down timer to "Reset" What does this do?
Bill
Makes sense now. Not as useful as I would like it to be though. 5 minutes would be about right for my purpose.
In your new Dash software there seems to be a count down timer to "Reset" What does this do?
Bill
- Thu Aug 02, 2012 12:45 am
- Forum: Electric Meters
- Topic: Question re:Max Demand and Power factor
- Replies: 4
- Views: 12083
Question re:Max Demand and Power factor
1. Can you explain to me just how "Max Demand Works" Your new "Dash" software seem to indicate that it resets. Software shows a count down to reset. How does the 15/30/60 intervals work. Average ? over the interval? Does Max Demand mean (=) Peak Demand from the last time it was Z...