Hi Jameson,
Is it possible to control the relay function of the Omnimeter through the EKMDash in such a way that:
1. Switching on or off the relay at different time zones
2. Switching on or off the relay when a peak or maximum demand has been reached (Level set through Dash per meter)
3. Scenario: 150 meters connected inline. Each meter measures electricity usage and each meter has 1 relay function to switch on and off 1 appliance (ie. boiler)
The power is cut through a power failure. After 1 hour power is restored resulting in all 150 boilers switching on at the same time, resulting in a sudden max peak demand.
This max peak demand is than used to charge the client.
Can you modify the Dash in such a way that we can through grouping the 150 units in soft starting the boilers. That is if a power failure is detected, the omnimeter
switches all relay controlled appliances off and than switches the groups time delayed on.
Thanks
Jens
Is it possible to control the relay function of the Omnimeter through the EKMDash in such a way that:
1. Switching on or off the relay at different time zones
2. Switching on or off the relay when a peak or maximum demand has been reached (Level set through Dash per meter)
3. Scenario: 150 meters connected inline. Each meter measures electricity usage and each meter has 1 relay function to switch on and off 1 appliance (ie. boiler)
The power is cut through a power failure. After 1 hour power is restored resulting in all 150 boilers switching on at the same time, resulting in a sudden max peak demand.
This max peak demand is than used to charge the client.
Can you modify the Dash in such a way that we can through grouping the 150 units in soft starting the boilers. That is if a power failure is detected, the omnimeter
switches all relay controlled appliances off and than switches the groups time delayed on.
Thanks